Calendar
December 2017
SunMonTueWedThuFriSat
« Aug  
 12
3456789
10111213141516
17181920212223
24252627282930
31 
Recent Comments

Log in
Email me at:

Archive for the ‘Modules’ Category

Appleton Gets Panelled

With Railfest just over a week away I have a couple projects to complete on my HO Free-Mo modules. It had been decided a little while ago that our modules should have panels installed on them for our throttles. We have been just using phone extension cords and looping them through the entire setup once we were set up. This was a real time consuming event both on set up and tear down.

I picked up my “Supply” (I bought some extra panels for my home layout) a week ago and started to prepare my Appleton set of modules for installation this week.

First up was to measure and decide what size of hole I was going to need then carefully mark the area to cut.

I love my power tools!!!! With my adrenaline starting to pump for “More Power” and get this hole cut I get my saw out to cut the hole and thought for a moment that any major shaking from a power tool might loosen up some scenery and such………………………. Hmmmmmmmm………………………………..

Maybe something a little lighter duty will be better suited for this job 🙂 I used my jig saw with a new scroll blade instead.

I had also decided to recess the panels a bit into the fascia of the modules because they usually get slid around on their side and I wanted to protect the face of the panels as much as possible. Fortunately having a plywood facia makes this job much easier and I remove one ply which was enough to give me satisfactory results. After test fitting and any fine-tuning, I painted the newly acquired hole and let it set until the next evening before installing the new panels.

Now with the panel installed it was time to run the wires and add a “customized” clip to hold the wire ends from “hanging around” during transport and shipping.

While doing this I noticed that the PC board was sort of vulnerable so I added a block of 2 X 2 to protect it.

There you have it! A fully installed panel and it took me almost as much time to install them as it takes to completely run the “old” phone cords at one set up. Can’t wait to see how much time this saves when everyone gets them installed!!!

Now that that is done I have some work to do an one of my two foot modules.

Stay tuned

See Ya

Al

The Crunch Is On

Well with only 2 evenings left my wife even helped out last night. I was working on the Ballast and she was working on the stream and painting the fascia. Can’t wait and RailFest is coming fast!!!!




See Ya

Al

New Modules Update

We’ll with Hillfest (Railfest 2009) upon us I have some good news. I now know my new modules will be ready for this event, no skirting but the trains will run for sure. Yesterday morning I took these photo and was wondering………….no, that’s not it, more like panicking as to how the blazes these were going to be ready for this weekend.

New Modules beofer the guys showed upNew Modules beofer the guys showed up

In these parts “Train” night is Monday night and like friends do in a pinch they lend a hand.  Trevor Brent and Luc all came over last night and help whip things into shape. I still can’t believe we got as much as got done last night in less than two hours. Thanks Guys, I really appreciate your help!!!!!
 
 
 
 
 
 
 
 
 
 
 

The Crew

Here is what we came up with.

New Modules

There is still a lot of “finishing” touches I will do later on but tonight I will get the track down and get the wiring setup and ready.

Only three more evenings!!!!!!!!

See Ya

Al